Resources & Facilities

Being a market leader in the façade systems market means you must have the resources and facilities to deliver. Our facilities are full of the latest machining technology all operated and managed by experienced staff.

Fleetwood firmly believe that the quality of the end product is ensured by minimising the human factor. Our shop floor layout is purposely designed to optimise the movement of material, and the JTS tracking system allows details of every job to be tracked through the manufacturing process. This enables the team to accurately forecast lead times and factory work load and ensure QA is kept at a premium. 

To see how our resources and facilities work for you click here and let us walk you through the process.

Tooley Street 06
Wandsworth Southside
Gresham Street 04
Factory
Hadd 01
St Georges
Tooley Street 06
Factory
South 03
factory 01
South 03
Tooley Street Detail
Hadd 01
Factory
Detail 05
Cotlands Road
Factory 3
Factory 1
Hadd 03
Hadd 01
Gresham Street
Gresham Street
Gresham Street 05
Wandsworth Southside

Fleetwood House,
480 Bath Road,
Slough, Berkshire
SL1 6BB

T. 01753 576 680
E. info@faa-group.co.uk

Wandsworth Southside